PROJECTS / THE OPEN FAB
HACKER FAB ADJACENT
To TSMC and ASML, on a Hacker Fab budget
Hacker Fab's open stack beside the industry's, row by row, and the gap between them. Our tools are to be engineered and built here, in Rust and CortenForge where they can be, but for those the safety rules keep bought.
We build on Hacker Fab's open designs and send back what we add. We are not part of Hacker Fab, and it has not reviewed this page. Safety comes first: tools on mains are bought, listed and legal, and every step runs under its own safety plan (fab.md, "Safety first"). Where a bought tool is what stops the next stage, making our own, at a fraction of the cost and meeting every safety mark, is weighed.
| MEASURE | HACKER FAB | INDUSTRY | GAP | OUR ROUTE |
|---|---|---|---|---|
| LITHOGRAPHY | ||||
| resolution, against High-NA EUV | 2 µm 1 stepper V2.1, $3,012.13 · developed, in resist | 8 nm 2 ASML TWINSCAN EXE:5200B · High-NA EUV, 0.55 NA | 250× | Climb the rungs below first. Shorter light and a wider lens are what move this; how far they go on this budget is unknown. A light source and optics of our own, which this rung would need, are raised with Jon (CLAUDE.md, Conventions). bought: optics and light sources are bought for now, and CortenForge has no optics |
| resolution, against i-line | 2 µm 1 stepper V2.1, $3,012.13 · developed, in resist | 350 nm 3 ASML TWINSCAN XT:400M · i-line, 365 nm; at most | 5.7× | A better objective, with a higher numerical aperture (fab.md, "Where to spend"). bought: a lens is bought |
| resolution, against a maskless writer | 2 µm 1 stepper V2.1, $3,012.13 · developed, in resist | 600 nm 4 Heidelberg Instruments MLA 150 · maskless; write mode I, 0.45 µm as an option | 3.3× | The i9 as the stepper's controller: the projector fed directly, and each exposure timed to the stage and to measured vibration. Rust · Amaranth |
| overlay, against i-line | 5 µm 5 stepper V2.1, $3,012.13 | 20 nm 6 ASML TWINSCAN XT:400M · at most, across the whole wafer, with ASML's optional TOP-2F software | 250× | Overlay measured on a calibration target before and after each change; the stage's loop on the i9, with input shaping from a measured resonance. Rust · Amaranth · CortenForge |
| overlay, against a maskless writer | 5 µm 5 stepper V2.1, $3,012.13 | 500 nm 7 Heidelberg Instruments MLA 150 · global second-layer alignment; local is 250 nm | 10× | Hacker Fab's fiducial finder for alignment, with the stage held by the i9's loop and its vibration modelled in CortenForge. Rust · Amaranth · CortenForge |
| largest wafer | 10 mm 8 stepper V2.1, $3,012.13 · 1 cm square | 300 mm 9 ASML TWINSCAN XT:400M · 300 mm across | 30× | Pieces of bought wafers first. Longer travel is the stage's, modelled in CortenForge before it is built. CortenForge |
| MOTION | ||||
| stage resolution | 1 µm 10 closed-loop nanopositioner · about | under 1 nm 11 PI piezo flexure stages | PI states no single figure | The nanopositioner's encoders read by the i9 from close by; later, a levitated stage modelled in CortenForge. Rust · Amaranth · CortenForge |
| DEPOSITION | ||||
| RF match time | 5 s 12 impedance matcher, $636.65 · about, from startup | 1 s 13 Advanced Energy Navigator II · under, depending on user settings | 5× | The digitizer measures the reflection's phase as well as its size, so the capacitors are set, not searched for. Rust · Amaranth |
| GAS | ||||
| flow control | Alicat mass-flow controllers 14 sputter tool's control station | 0.8 % 15 MKS CMA10B · of set point, from 20 to 100 % of full scale | not compared: Hacker Fab buys industry MFCs | Bought, as Hacker Fab does. bought: an industry part already, and none of our steps uses process gas yet |
| DEVICES | ||||
| gate length | 5 µm 16 NMOS, CMU Fab, March 2026 | 14 nm 17 IRDS 2024, More Moore · roadmap for 2025, the "2nm" node, high-performance logic; read from table MM-7's image | 360× | fab.md's steps 4 to 6: our stepper on Hacker Fab's NMOS process, then a small hardwired network. Rust · Amaranth |
| CLEANLINESS | ||||
| air | no cleanroom 18 Hacker Fab's goals | classes of air by particle count 19 ISO 14644-1:2015 · its title, as Wikipedia cites it; the standard was not read | open air, against classified air | An enclosure for each tool, its air measured with a particle counter and logged. Rust · bought |
| CONTROL AND SAFETY | ||||
| tool control | SputterOS, begun as a shared base 20 SputterOS | GEM, over SECS-II 21 SEMI E30-0526 · its abstract; the standard was not read | a shared base begun, against one standard | One controller and interlock design across the tools, in Rust on Tock, compared with SputterOS on a simulated chamber. Rust |
| equipment safety | a goal: minimal danger 22 Hacker Fab's goals | a written health and safety guideline for equipment 23 SEMI S2-0724E · its abstract; the guideline was not read | a goal, against a written guideline | A safety plan for each step before anything is bought, and interlocks below the agent, in Rust on Tock and in hardware (fab.md, rules 1 and 2). Rust |
unknownEvery route is a proposal: nothing on it is built or measured yet. The two sides are their sources' figures, quoted below.
Sources
- “Developed Resolution | 2 µm” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “Resolution | 8 nm” asml.com, read 2026-11-25
- “Resolution (nm) | ≤ 350” asml.com, read 2026-11-25
- “Minimum feature size [μm] | 0.6 (0.45 optional)” heidelberg-instruments.com, read 2026-11-25
- “Overlay Alignment Accuracy | 5 µm” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “prints 200 mm and 300 mm wafers with ≤ 20 nm overlay across the entire wafer” asml.com, read 2026-11-25
- “Global 2nd layer alignment [nm] | 500” heidelberg-instruments.com, read 2026-11-25
- “Maximum Wafer Size | 1 cm x 1 cm” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “prints 200 mm and 300 mm wafers” asml.com, read 2026-11-25
- “~1um resolution but highly affected by vibration” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “PI's piezo flexure stages combine sub-nanometer resolution and guiding precision with minimum crosstalk.” physikinstrumente.com, read 2026-11-25
- “Match Speed From Startup | ~5 seconds” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “Tune Time < 1 sec, depending on user settings” advancedenergy.com, read 2026-11-25
- “Alicat MFCs | Regulate process gas flow.” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “±0.8% of set point for 20 to 100% Full Scale” mks.com, read 2026-11-25
- “5 um gate length” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “Lg: Gate Length - HP (nm) | 14” irds.ieee.org, read 2026-11-25
- “No cleanroom needed” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “ISO 14644-1:2015 - Cleanrooms and associated controlled environments -- Part 1: Classification of air cleanliness by particle concentration” en.wikipedia.org, read 2026-11-25
- “Deterministic C++17 microkernel framework for safety-critical nanofab system control” github.com, read 2026-11-25
- “GEM defines a standard implementation of SECS-II for all semiconductor manufacturing equipment” store-us.semi.org, read 2026-11-25
- “Minimal danger” hacker-fab/gitbook at bd1eef57, read 2026-11-25
- “intended as a set of performance-based environmental, health, and safety (EHS) considerations for semiconductor manufacturing equipment” store-us.semi.org, read 2026-11-25